金盤網首頁
移動端
  • 金盤網APP
  • 金盤網公眾號
  • 金盤網小程序
x

專營店首頁 成功案例 主創團隊合作伙伴商家介紹 店鋪動態

首頁>金盤國際>成功案例> Puerto de la Cruz Waterfront and Marine Park
關注關注:0 瀏覽:1087分享分享到

Puerto de la Cruz Waterfront and Marine Park

與城市之間的rela0400o水前從里斯本條約的情況下,通過結構和連接這兩個城市的現實情況,即,在這樣的背景下,如何articula0400o結構與前一個工作的一部分água.esteidentifica0400o城市地域系統的基本網格。梳狀結構,由兩個不同但相互關聯的邏輯形態。

服務范圍:規劃設計

設計參考價: 200 元/平方米
瀏覽人數:
1087

金盤國際

描述 服務

4.8 4.8

好房設計力指數:待認證

成功案例

  • 項目名稱:Puerto de la Cruz Waterfront and Marine Park
  • 設計參考價:¥200/㎡
  • 項目類型:其他
  • 發布日期:2016-11-05
  • 最近更新:2016-11-05 12:20

Location: Puerto de La Cruz, Canary Islands, Spain

Year of Design / Current Project Condition: 2015 – on-going

Estimated date to start construction: fall 2017

Built m2: 82.000 m2 (building 16.000 m2 + urbanization)

Public use area: 29.721 m2

Cost:  36.508.000 Euros

Architect: Fernando Menis

Client:  Teleferico Pico del Teide S.A.

Consultants:  MSFPA S.A (Engineers); Marisa Tejedor (Marine Biology)


Description

The town of Puerto de la Cruz has always been an example in the history of the Canary Islands tourism as a pioneer of tourism development. It is a mature and expert destination, which however has suffered from the consequences of time and, despite its undoubted value, needs a major renovation.

Taking advantage of the upcoming creation of a new harbor area, Menis propose the complete regeneration of the entire waterfront, which, together with a new multifunctional area around the waterfront, would achieve a large-scale urban regeneration. In this sense, the project recovers the original position of the waterline disappeared since the 50s and 60s when a containment wall and a maritime esplanade were built for safety and protection reasons.

To achieve this, the project uses - and this is its core concept - the Canary Islands Stream (La Corriente de las Islas Canarias) in order to build a water layer with a varying width between 25m and 40 m.  What is the Canary Islands Stream? It is the natural current of the Atlantic Ocean that runs from East to West and turns from the Canary Islands to the Caribbean, and from there to North along the US coast to the North Pole and then down to England, Portugal and gets back to the Canary Islands. This current explains the Canaries climate on both sides of the Ocean and it actually helped Columbus to discover America. The project conceived by Fernando Menis directs the stream naturally, pacifying it, in this way, allowing water sports and activities in a controlled area. Otherwise, due, to the strong Atlantic Ocean, we could not even think of such activities; at Tenerife North, swimming or any other water sports use to be dangerous in certain times of the year, especially in wintertime. This ingenious use of the Canary Islands Stream adds a high value to the harbor and it also produces a second beachfront facing the volcanic mountain El Teide, Spain's highest peak. Besides by using the stream, Menis intends to restore the close relation the old town of Puerto de la Cruz has historically had with the Ocean. Formerly the water reached to where our design intends to conduct the stream, bringing the water back to people again and recovering the historical profile of the town. 

Behind this water layer and parallel to it, multi-purpose buildings will be built to transform the harbor into a whole new public area to offer leisure and economic activities. This will be a new core of the economic and urban recovery designed to facilitate social cohesion and cultural activities. The program of this set is more than a simple mix of functions; the aim is to achieve an organic connection between the old town grid and the harbor; to connect individual spontaneity, participation and educative entertainment with commerce and gastronomy. The set will contain: public squares, public promenades, a shopping mall, a sailing school, a beach club with a pool on the deck whose bottom is actually the transparent ceiling of the underneath rooms, a night garden, parking, a 360 o viewpoint, restaurants, an open air Auditorium, flowers and gastronomic market and a fish market.

Menis’s design includes a new beach as an extension of Playa Jardín (The Garden Beach) designed by César Manrique in 1992. There are a number of features that distinguish the new beach from the existing one: it is a privileged natural viewpoint since it looks at the spectacular volcanic mountain El Teide. Moreover, because it faces south, its users will be protected from the cold trade winds (Los Alisios) and big waves; bathing will be accessible and easy for everyone, throughout the year. The new harbor breakwater will also "support" the beach, which makes its construction sustainable and will help maintaining the sand in place in a natural way. Local volcanic black sand will cover the beach. Between the beach and the town, there is a greenery layer that covers a parking underneath. Among the natural trees there are artificial trees (lampposts) able to harvest sun energy during the day to use during the night for the lighting. 

看詳細研發檔案(最多300+P)>>
提示
X

材料清單兌換需消耗 29金豆,確定兌換該項目材料清單?

金豆數:如何獲得金豆?

提示
X
你已認領5個材料,不可再認領。
開通旗艦店可不限認領數量,是否去開通旗艦店?
材料清單
X
上一頁 下一頁
選擇材料
X
商家列表
X

關于金盤網 | 幫助中心 | 聯系我們 | 網站合作 | 法律聲明
客戶熱線:020-38182178 客服郵箱:278777221@qq.com
粵ICP備2022080590號
Copyright www.kinpan.cn,All Rights Reserved

99热这里只有精品国产动漫 | 国产精品99久久不卡| 人妻少妇乱子伦精品| 国产成人精品一区二区三区无码| 四虎影视精品永久免费| 精品videossexfreeohdbbw| 国产精品一区二区久久| 91麻豆精品在线观看| 麻豆aⅴ精品无码一区二区| 国产精品免费AV片在线观看| 亚洲精品乱码久久久久久按摩 | 精品久久久久久久久久中文字幕 | 亚洲乱码日产精品a级毛片久久| 无码专区国产精品视频| 精品久久久久亚洲| 精品乱码久久久久久中文字幕| 青青草国产三级精品三级| WWW国产精品内射熟女| 高清国产一级精品毛片基地| 色欲麻豆国产福利精品| 亚洲av永久无码精品秋霞电影秋| 91精品成人免费国产片| 精品国产乱码久久久久久人妻| 亚洲国产精品一区二区久| 精品久久亚洲中文无码| 一区国产传媒国产精品| 免费无码精品黄AV电影| 影院成人区精品一区二区婷婷丽春院影视| 久久精品麻豆日日躁夜夜躁| 国产成人午夜精品一区二区三区| 国语自产精品视频在线第| 国产精品国产午夜免费福利看| 国产日韩精品视频| 久久久精品午夜免费不卡| 国内精品51视频在线观看| 国内精品一级毛片免费看| 久久国产精品鲁丝片| 99久久精品国产片久人| 在线精品一卡乱码免费| 精品国产亚洲第一区二区三区| 国产精品99久久久|